~10 min by voice
This checks whether a senior engineer can turn load testing into a managed project: a justified load forecast, a realistic profile, success criteria set in advance through SLOs, and an iterative cycle of finding bottlenecks with time to spare. Running JMeter with "lots of users" isn't enough for that.
The interviewer will ask this question and listen. Think out loud and ask for a hint if you need one. When you're done, pause or tap “That's my answer”. In about a minute, your score and the points you covered show up here.
Sign in to answerBest with headphones · ~10 min